Q-2, r. 9.01 - Design code of a storm water management system eligible for a declaration of compliance

Full text
147. Each square metre of the surface of the grassed ditch must be covered 90% by shoots at least 120 mm high after a 7-week or more growth within the growth periods indicated in Table 4.6, according to the hardiness zone determined by Natural Resources Canada.
Table 4.6 Growth period according to hardiness zone
Hardiness zoneGrowth period
2a and 2bFrom 30 June to 21 August
3a and 3bFrom 15 June to 30 August
4a and 4bFrom 21 May to 10 September
5a and 5bFrom 10 May to 21 September
O.C. 871-2020, s. 147.
In force: 2020-12-31
147. Each square metre of the surface of the grassed ditch must be covered 90% by shoots at least 120 mm high after a 7-week or more growth within the growth periods indicated in Table 4.6, according to the hardiness zone determined by Natural Resources Canada.
Table 4.6 Growth period according to hardiness zone
Hardiness zoneGrowth period
2a and 2bFrom 30 June to 21 August
3a and 3bFrom 15 June to 30 August
4a and 4bFrom 21 May to 10 September
5a and 5bFrom 10 May to 21 September
O.C. 871-2020, s. 147.